01 / THE STORYEstimating was holding back bids.
Cody Russell, CRO of Priority Commercial Nationwide, was looking for help with commercial estimating. Some of the platforms the team used got pricey fast, and every bid meant sketching the job and reading the specs. Cody wanted to bring AI into the process to free up time and get more bids out the door.
“In the first month with being on the software, I’ve cranked out 100 proposals, which is a lot higher than what I was doing before, and it’s not as stressful.”
02 / THE STORY100 proposals in the first month.
In the first month on XBuild, Cody reports preparing 100 proposals, a lot more than before and with less stress. Priority still uses The EDGE, which Cody credits with more detail and better material lists. After winning a job, the team can return to The EDGE or Excel for material orders. XBuild’s role is getting more proposals out, which means more chances to win work.
03 / THE STORYUsing real job costs to sharpen the next bid.
When a job wraps up, Cody enters the actual job costs, pulls up the original estimate, and checks whether the target margin was hit. Seeing which costs ran over or under helps Priority bid more competitively next time. XBuild’s market labor estimates give a starting point in each region, which Cody then adjusts.
Earlier: the October 9 early-access session.
Live test finding from an XBuild Operator session with Priority Commercial Nationwide on October 9, 2026, run on one active estimate. Project manuals and job books are requested next steps, not live features.
Commercial estimates carry a lot of lines.
Priority Commercial Nationwide works on commercial roofing projects such as adhered roof systems, where a single estimate can go through many versions and dozens of cost lines. The team wanted to know whether the XBuild Operator could read one of its own estimates and return the cost detail behind it on request.
A real estimate, asked in plain language.
In a live session, the team asked for labor, material and equipment costs on an active estimate, with a profit breakout. Before the run, they flagged a likely snag. Their estimating categories offer labor, material and miscellaneous, so equipment might be filed under miscellaneous and get missed.
The Operator returned its answer in 27 seconds. It covered all 21 versions of the estimate and organized 22 material lines, 12 labor lines and three equipment lines, each with cost and sell price.
Miscellaneous, mapped the way the team works.
The answer handled the snag directly. It pulled out three miscellaneous site items (mobilization, fall protection and portable toilet rental) and identified the other nine miscellaneous lines as overhead and soft costs. It then offered to move any of them into equipment if the team preferred. The team said the mapping was fine as it stood.
That small exchange is the useful part. The Operator showed its reasoning on a real classification question, and the people who own the estimate could confirm it in seconds.
Next: a working manual for each project.
The team described where they want this to go. After a takeoff, they would like a working summary of job requirements such as site hours, gate times, submittal schedules, permit responsibilities and change order limits, so hidden costs surface before work starts.
They also want a project manual for each won job: specifications tied to local building codes, field details and the safety data sheets required on site, with one copy in the office and one in the field. These are next-step ideas from the session, and XBuild's team saw them as a natural direction for the Operator.